Innclose delivers the largest cooling tunnel project ever.

In April 2020, Innclose completed a project for the Belgian cooling tunnel builder SKT. The cooling tunnel has a length of 21 meters and is the largest casing that Innclose has ever built. Innclose not only supplied the panels for the casing of the cooling tunnel, but also stable sub-frames. The cooling tunnel at SKT was built with these sub-frames and transported modularly to the end customer including the casing. This way of mounting saves SKT a lot of time. Cooling tunnels are often placed in an existing production environment. It is important that they can be set up as quickly as possible in order to keep the necessary downtime of current production as short as possible. SKT showed this concept to potential customers during the build-up and quotations for a subsequent assignment have already been issued by SKT and Innclose